iValue team contributed to finalization of field survey & investigation activities with government teams (i.e. APGENCO/WAPCOS) to finalize the best possible alternatives for enhancing project generation capacities (i.e. adding 2x115MW). Based on detailed technical evaluation during 2018-20, a techno-economic feasible proposal for enhancing power generation in Lower Sileru project HEP was concluded. Finalized technical and costing report further led to award of the project for construction. The construction for added units (2x115MW) of the Lower Sileru HEP is under progress at site.
View showing Lower SileruPowerhouse & Penstocks
View showing Lower SileruPowerhouse & downstream channel carrying power house discharges